Quantcast
Channel: NYC Transit Forums RSS Feed
Viewing all articles
Browse latest Browse all 3025

Giant drill bit narrowly misses packed ‘F’ train

$
0
0
QUEENS (PIX11) – A giant drill bit narrowly missed drilling right through a packed subway car in Queens Thursday morning. The machinery, being used for the East Side Access project, was being operated by a contractor above ground near the 21st St. Station in Long Island City. The drill bit narrowly missed hitting a packed ‘F’ train. (Photo: MTA) The drill bit, measuring 10 inches in diameter, broke through the tunnel’s roof at about 11:45 a.m., grazing the top and side of an ‘F’ train with approximately 800 people aboard, according to the MTA. http://pix11.com/2014/10/30/giant-drill-bit-narrowly-misses-packed-f-train/

Viewing all articles
Browse latest Browse all 3025

Trending Articles