From a purely engineering perspective, could it be done? By it, I mean building either another deck of tracks on top of existing el's (e.g. West End, brooklyn Broadway), open cuts (Sea Beach, Brighton), and a lower deck on underground tracks (e.g. Nostrand).
↧